Pages

Wednesday, August 28, 2013

Reefer Container 3.1 Monitoring system,3.2 Monitoring SOP,3.3 Monitoring reefer laden SOP PART 4


3.1 Power Point Slide_Monitoring system,3.2 Monitoring SOP,3.3 Monitoring reefer laden SOP PART 4

Same slide with part1,2,3.

3.1 Monitoring system,3.2 Monitoring SOP,3.3 Monitoring reefer laden SOP PART 2


Power Point Slide_Monitoring system,3.2 Monitoring SOP,3.3 Monitoring reefer laden SOP PART 2


3.1 Monitoring system,3.2 Monitoring SOP,3.3 Monitoring reefer laden SOP PART 1


                                    

Power Point Slide_3.1 Monitoring system,3.2 Monitoring SOP,3.3 Monitoring reefer laden SOP PART 1


Monday, July 22, 2013

REEFER TECHNICAL COMMITTEE 2012

REVISION KNOWLADGE COMMITTEE 30-10-2012 


CARRIER COMMITTEE 10/10/2012 TROUBLESHOOTING AND AUTO PUMP-DOWN
                           

CARRIER COMMITTEE 8/10/2012 TROUBLESHOOTING 24VOLT & LOW VOLTAGE

CARRIER COMMITTEE 4/10/2012 UNIT RUNNING SYSTEM, COMPRESSOR RECIP TROUBLESHOOTING & PRESSURE-SUCTION SYSTEM

CARRIER COMMITTEE 3/10/2012 UNIT SYSTEM CONTROL & TECHNOLOGY

CARRIER COMMITTEE 26/9/2012 CONTROLLER COMPUTERIZED SYSTEM & TECHNILOGY PART 2

CARRIER COMMITTEE 26/9/2012 CONTROLLER COMPUTERIZED SYSTEM & TECHNILOGY PART 1

CARRIER COMMITTEE 24/9/2012 COMPONENT, FUNCTIONING, CONTROL SYSTEM & TROUBLESHOOTING

CARRIER COMMITTEE 20/9/2012 COMPONENT, FUNCTIONING, CONTROL SYSTEM & ELECTRIC

CARRIER COMMITTEE 12/9/2012 COMPONENT, FUNCTIONING & CONTROL SYSTEM

CARRIER COMMITTEE 10/9/2012 COMPONENT & FUNCTIONING

CARRIER COMMITTEE 6/9/2012 BASIC OF REFRIGERATION & THERMODYNAMICS

CARRIER COMMITTEE 4/9/2012 PRE-TRIP INSPECTION PROCEDURES