Description |
---|
Requirements: The pressure sensor must read at least 50 psig prior to this test. Setup: This test will continue with the drain and nitrogen purity valve (NPV) closed for 10 seconds, and then run with NPV open for 10 seconds. A timer will be displayed during the test. Pass/Fail Criteria: Passes for a detected initial pressure greater than 50 psig and pressure drop of greater than 10 PSIG, from the 50 psig minimum starting pressure, after the Nitrogen Purity Valve opens. Fails otherwise. |
Carrier CA PTI Codes P1-2
Engineering Workshop - Pura Kencana, Seri Gading, Batu Pahat, Johor
0187652032 (WhatsApp only)
Subscribe to:
Posts
(
Atom
)