Description |
---|
Requirements: Valid oxygen sensor calibration values must be available. (Zero-point and span.) The membrane temperature should be within 3_C of setpoint. However, this test will not fail if this requirement is not met. Setup: This test will check the nitrogen percentage from the membrane while the nitrogen purity valve is energized, and will run for up to 10 minutes. Pass/Fail Criteria: Passes, with P5-1 displayed, for a successful check as defined by the following: N2 range between 88 and 97%. Fails otherwise. |
Carrier CA PTI Codes P5-1
Engineering Workshop - Pura Kencana, Seri Gading, Batu Pahat, Johor
0187652032 (WhatsApp only)
Subscribe to:
Posts
(
Atom
)